Independent technical governance and programme assurance. 15 years supporting complex infrastructure delivery across HS2, Hinkley Point C, LoHAC, CCPPs, Oil & Gas and Copenhagen Metro.
Precast
29 HS2 precast beam structures delivered by FTB — Technical Manager / TWC role held across all assets.

FTB's first bridge from their newly established Melton Mowbray facility, marking their ISO accreditation and commitment to quality.

Critical structure facilitating safe HS2 passage over existing Network Rail line. Marked the launch of a new FTB production line.

Second structure in FTB's T-beam production line. 60m, 3-span integral bridge spanning over the proposed electrified HS2 lines.
Largest T-beam asset in FTB scope for HS2. 56 beams over 5 spans with four different skew angles and complex edge beam detailing.

91m bridge carrying HS2 over the West Coast Main Line. Deliveries coordinated across 14 consecutive rail possession weekends.
Entrance portal to an HS2 green tunnel. Bespoke stainless-steel inserts and earthing components promote biodiversity goals.

185m structure, 14m high. Just-in-time delivery of up to 8 beams per day required detailed logistics planning.
First precast prop structure on the programme. Critical entry point to one of the deepest HS2 tunnel sections along the Midlands route.

Marks the operational launch of FTB's final casting line. Highest architectural finish specification within the project.

Key Design Element requiring community involvement. U-shaped edge beams at 95T required police escorts and night movement orders.

50m three-span integral bridge. Close coordination ensured clash-free interface between beams and diaphragm starter bars.

81m four-span overbridge allowing HS2 beneath the historic Fosse Way Roman road. Proactive logistics overcame adverse weather.

Will support four HS2 rail lines. Edge protection pre-fitted offline — entire delivery and installation completed in just two days.

52.6m three-span integral bridge. Road permanently realigned and raised ~10m for HS2 clearance. Constructed partially offline.

Single-span integral bridge at 90° to track. Accommodates agricultural access, PRoW footpath, and 16m-wide green bridge feature.

69m, 22m-wide green overbridge. All 45 beams delivered and installed within 10 days despite challenging weather conditions.
Allows Hollywell Brook to pass beneath HS2 Birmingham Interchange, minimising environmental impact and flood risk.

Hybrid two-stage construction. Props serve as temporary restraints during excavation then provide permanent support once base slab is complete.

58.6m three-span structure, 120-year design life. Deck width of 17m. Engineered for safe vehicle passage over two HS2 mainline tracks.
54.9m three-span bridge carrying realigned Bangley Lane over two HS2 mainline tracks. Owned and maintained by HS2.

61m three-span bridge at 15° skew. One pier linked to Burton Green retaining wall; other built using top-down methods with single row of piles.

53m three-span integral bridge engineered for 120-year service life. 24.2m central span at 1.5° skew over twin HS2 slab track.

Vital crossing carrying realigned A445 over HS2. Three-span integral structure, eight T-beams per span, 10.8m overall width.

Precast beam production and temporary works governance for a highway overbridge carrying Sutton Road over the HS2 mainline under the FTB scope.

Twin multi-span viaduct structures carrying the realigned highway over the HS2 mainline. Precast beam production and full temporary works governance under the FTB scope.

Precast beam production and temporary works governance for the Church Lane overbridge carrying the realigned local road over the HS2 mainline under the FTB scope.
Multi-span viaduct carrying the HS2 mainline over the River Leam. Precast beam production and full temporary works governance under the FTB scope.

Precast beam production and temporary works governance for the A45 Service Road overbridge carrying the realigned local road over the HS2 mainline under the FTB scope.

Precast beam production and temporary works governance for the M42 Coleshill South viaduct structure carrying the realigned highway over the HS2 mainline under the FTB scope.
Steel
Selected steel structures across rail, commercial, energy and industrial projects — engineering, assurance and fabrication oversight.

Structural analysis and check of HRSGs and auxiliary steel structures for two Mexican combined-cycle plants (850 MW Noreste, 1,155 MW Altamira V) to Eurocode, AISC and ASCE with seismic analysis.

QA/QC compliance lead for structural and geotechnical packages on Total's €337M refinery-to-biorefinery conversion near Marseille — structural assessment of existing facilities.

Glazed steel-framed infill roof bridging the Grimshaw WIT arch and the 1920s concourse roofs. 52m spine truss (4.2m deep, 27t) on 508mm CHS columns — 2020 Structural Steel Design Award Commendation.
Waste-to-energy environmental complex set in a forested valley — exposed structural steel framework supporting a green-panelled processing hall, solar-array roof and integrated mechanical treatment.

Concrete-framed LSE academic building with integral sculptural steel 'tree' columns supporting the upper floors — ~3,500t carried. Ten storeys over two basements, Grafton Architects.

Full demolition behind a retained historic stone façade opposite Buckingham Palace — propped steel retention frame and new steel structure delivering a 205-bed private medical clinic.

Automotive R&D facility with an exposed structural steel lattice roof and perforated metal facade. Warm clerestory glazing frames a low-rise research campus engineered for long-span, column-free workshop volumes.

Site supervision and structural assessments for PDVSA's deep-conversion oil & gas infrastructure — temporary stability bracing for steel pipe-rack assembly (INELECTRA).
Factory design and production planning for precast, structural steel and specialist manufacturing facilities. Discrete Event Simulation (DES) is used to assess production flow, capacity, resource utilisation, WIP and bottlenecks, and to evaluate alternative factory configurations before implementation.


Selected assignments across bridges, tunnelling, nuclear, energy, and heavy civils. Full project register available on request.